Skip to main content

This job has expired

Solar Project Engineer

Employer
Barrick Gold
Location
Carlin, Nevada, United States
Salary
Competitive
Closing date
Jun 15, 2022

View more

Category
Engineering
Work Term
Contract
Work Load
Full Time
Language
English
Position Description:

Would you like to have a career with a collaborative, diverse, and dynamic mining company? We have an exciting opportunity for you! Our people division is growing, and we are looking for a Solar Project Engineer at our operations. The successful candidate will be involved in the execution of all aspects of large capital projects, including planning, design, approval, construction, and commissioning.

At Nevada Gold Mines, our vision is to be the world's most valued gold mining business by finding, developing, and operating the best assets with the best people. We are committed to a safe work environment sending every person home safe and healthy every day and leaving a sustainable legacy on our host communities.

Responsibilities:

  • Assist in managing all aspects of a project from scoping, prefeasibility, and feasibility to execution, including construction and commissioning
  • Assist in providing design input to engineering consultants
  • Assist in coordinating efforts internally within Barrick during planning, design, construction, and commissioning
  • Assist in completing in-house design for improvements of the appropriate size and complexity
  • Initiate regular communication with operations, environmental, safety, project sponsor and stakeholders
  • Assist in procurement of equipment, supplies and contracts
  • Proactively manage project to achieve quality, schedule, budget, and safety
  • Utilize project life-cycle tools to track and record project performance
  • Inform management of schedule, costs, quality control, document control of any issues which may arise during the project life cycle.
  • Perform other duties as assigned.


Qualifications:

  • Previous solar design/construction specific experience preferred
  • Two years of work experience (design, construction management) with degree in Engineering discipline required (Mechanical, Electrical, Civil, or related)
  • One to two years of contractor management experience preferred
  • Engineering in Training (EIT) certificate preferred
  • Project Management knowledge is required
  • Experience with managing contractor and contract management is preferred
  • Competence in MS Office is required
  • Strong oral and written communication skills are required
  • Ability to work in a team is required


What We Can Offer You

  • A comprehensive compensation package including a competitive medical, dental, and vision plan with national provider networks, a 401k retirement plan with employer contribution, paid time off, company-sponsored medical clinics, company match share purchase program, and much more!
  • Work in a dynamic, collaborative, progressive, and high-performing team.
  • Opportunities to grow and learn with the industry colleagues are endless.
  • Access to a variety of career opportunities across the organization.
  • Nevada Gold Mines is committed to creating a diverse environment and is proud to be an equal opportunity employer.
About Nevada Gold Mines

Nevada Gold Mines is a joint venture between Barrick Gold Corporation (61.5%) and Newmont Goldcorp Corporation (38.5%), combining their significant assets across Nevada to create the single largest gold-producing complex in the world and realize the full potential of these mines through synergies and best-in-class operational improvements.

The massive mining operation comprises 8 mines along with their associated infrastructure and processing facilities that produced an estimated 4 million ounces of gold in 2018. Three of these assets are Tier One gold mines: Barrick's Cortez; the combination of Barrick's Goldstrike and Newmont Goldcorp's Carlin; and the combination of Barrick's Turquoise Ridge and Newmont Goldcorp's Twin Creeks. In addition, Barrick's Goldrush-Fourmile project has the potential to become the fourth Tier One asset in this portfolio. The new JV is expected to generate around $5 billion in cost savings over the next five years. Nevada Gold Mines is operated by Barrick .

Thank you for your application, however, only those selected for an interview will be contacted.

Get job alerts

Create a job alert and receive personalized job recommendations straight to your inbox.

Create alert